I started working on the woven steel structure for the new top secret space. I was planning to create some elements of the form in the studio using the column in my space as a guide, but then I was going to set up shop in their space and build out the rest of the form. Unfortunately, or maybe fortunately they hit a delay on their end so the actual install is temporarily pushed back another week or so. This is great for me since I have some prep work to do for the city gallery piece and I actually have some applications and proposal deadlines I need to knock out. As well I will be moving out of this studio on June 1st. I have toyed with the idea before of having an open studio/closing studio event back in December when I thought I was losing my space forcibly, but now I will probably have some sort of event/opening/closing reception yard sale. I would like to mark the end of this studio, since the last two years have been a significant period of growth for me artistically and much of it was fueled by time spent both in this studio and in residencies and working on other sites, but always grounded by knowing i would return to this space.
next i began forming them into a more basket like structure allowing it to form around the column. Ultimately the piece will be more of an organic woven form engaging directly with the space i will install it in.